Weather Operations Risk Assessment template

Free Weather Operations Risk Assessment template for aviation you can edit online and download as PDF. Covers weather operations information, weather hazard risk assessment matrix, weather monitoring and warning systems.

Weather Operations Information

ASSESSMENT ID: WX-__________ DATE: ______________ TIME: ______________

LOCATION: ______________ AIRPORT: ______________ VALID UNTIL: ______________

OPERATIONS MANAGER: ______________ CHIEF METEOROLOGIST: ________ ASSESSOR: ______________

SEASON: Spring ☐ Summer ☐ Fall ☐ Winter ☐ Monsoon ☐ Hurricane Season ☐

CURRENT CONDITIONS: Temp: ___°C Wind: ___ kts Vis: ___ km Ceiling: ___ ft

FORECAST CONDITIONS: ______________

Weather Hazard Risk Assessment Matrix

WEATHER PHENOMENONAFFECTED OPERATIONSPOTENTIAL CONSEQUENCEEXISTING MITIGATIONSPROBABILITY (1-5)SEVERITY (1-5)RISK INDEX (L x S)
Thunderstorms / Lightning-Flight ops
-Ground ops
-Fuel handling
-Maintenance
-Passenger handling
-Lightning strike
-Hail damage
-Wind shear
-Turbulence
-Flight delays
-Ramp closures
-Weather radar
-Lightning detection
-Procedures
-Ground stop protocols
3 (Occasional)4 (Critical)12 (HIGH)
Low Visibility (Fog/Smog)-Flight ops
-Ground ops
-Vehicle ops
-Baggage handling
-Flight diversions
-Delays
-Ramp incursions
-Vehicle collisions
-Personnel disorientation
-Low vis procedures
-Enhanced lighting
-Follow-me vehicles
-Speed limits
-Training
4 (Probable)3 (Major)12 (HIGH)
Strong Winds / Gusts-Flight ops
-Ground ops
-GSE operation
-Ramp work
-Maintenance
-Crosswind exceedance
-Landing incidents
-Blown GSE
-FOD
-Personnel injury
-Structural damage
-Wind limits
-Aircraft securing
-GSE tiedown
-Work suspension procedures
-Wind monitoring
4 (Probable)4 (Critical)16 (EXTREME)
Heavy Precipitation (Rain/Snow)-Flight ops
-Ground ops
-Baggage handling
-Passenger handling
-Maintenance
-Reduced braking
-Hydroplaning
-Aquaplaning
-Flooding
-Slips/falls
-Equipment damage
-Runway friction assessment
-Contaminated runway procedures
-Drainage maintenance
-Non-slip surfaces
3 (Occasional)3 (Major)9 (MEDIUM)
Extreme Temperatures (Heat/Cold)-Flight ops
-Ground ops
-Maintenance
-Cargo handling
-Passenger handling
-Heat stress
-Hypothermia
-Equipment failure
-Deicing needs
-Battery issues
-Heat stress program
-Cold weather procedures
-Heated/ cooled facilities
3 (Occasional)3 (Major)9 (MEDIUM)
Icing Conditions-Flight ops
-Ground ops
-Maintenance
-Aircraft icing
-Control issues
-Performance degradation
-Stall
-Accident
-Deicing procedures
-Anti-icing fluids
-Holdover tables
-Training
-Deicing pads
3 (Occasional)5 (Catastrophic)15 (EXTREME)

Weather Monitoring And Warning Systems

SYSTEM TYPEAVAILABLEOPERATIONALREDUNDANCYWARNING TIMELAST TESTNEXT TEST
Automated Weather Observation System☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
Continuous__________________
Weather Radar☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
Real-time__________________
Lightning Detection System☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
5-10 min__________________
Wind Shear Alert System☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
1-3 min__________________
Low Visibility Warning System☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
15-30 min__________________
Runway Surface Sensors☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
Continuous__________________
Ceilometer☐ Yes
☐ No
☐ Yes
☐ No
☐ Yes
☐ No
Continuous__________________

Weather-Related Operating Limits And Procedures

OPERATIONPARAMETERLIMIT VALUEMONITORINGACTION REQUIRED
Takeoff/Landing (Aircraft Type: _____)Crosswind Tailwind Visibility Ceiling______ kts ______ kts ______ m ______ ftContinuous Continuous Continuous ContinuousCaptain's discretion / Hold / Divert Captain's discretion / Hold / Divert Low vis procedures / Hold / Divert Approach ban / Hold / Divert
Ramp OperationsWind Speed Lightning Visibility Temperature______ kts Within __ NM ______ m ____ °CContinuous Detection Continuous ContinuousSuspend高空作业 / Secure equipment Stop all outdoor activities Reduce speed / Follow-me required Heat/cold stress protocols
Fuel HandlingLightning Wind SpeedWithin __ NM ______ ktsDetection ContinuousStop fueling operations Suspend fueling / Secure equipment
Maintenance (External)Wind Speed Precipitation Temperature______ kts ______ ____ °CContinuous Observation ContinuousSuspend work at height Suspend outdoor maintenance Cold weather / Heat protocols
Passenger Boarding (External stairs)Lightning Wind Speed PrecipitationWithin __ NM ______ kts ______Detection Continuous ObservationSuspend boarding / Hold in terminal Suspend stairs use / Use aerobridge Provide shelter / Umbrellas

Severe Weather Preparedness Checklist

PRE-SEASON PREPARATION:

☐ Weather procedures reviewed and updated ☐ Staff trained on seasonal hazards

☐ Equipment inspected and serviced ☐ Emergency supplies stocked

☐ Communication systems tested ☐ Coordination with met office established

☐ Contingency plans reviewed ☐ Exercises conducted

THUNDERSTORM/LIGHTNING PROCEDURES:

☐ Monitor weather radar continuously ☐ Activate lightning detection system

☐ Issue warnings to all departments ☐ Suspend outdoor activities when lightning within 5 NM

☐ Secure loose equipment ☐ Move GSE to safe areas

☐ Stop fueling operations ☐ Advise flight crews

☐ Prepare for ramp closures ☐ Resume operations 30 min after last lightning

LOW VISIBILITY PROCEDURES:

☐ Activate low visibility plan ☐ Notify all departments

☐ Implement reduced speed limits (10 km/h) ☐ Consider follow-me vehicles for aircraft

☐ Enhance lighting ☐ Increase spotter presence

☐ Review vehicle routes ☐ Brief all personnel

☐ Consider suspending non-essential ops ☐ Monitor visibility trends

HIGH WIND PROCEDURES:

☐ Monitor wind speeds continuously ☐ Issue wind alerts

☐ Secure all GSE (brakes, chocks) ☐ Tie down light equipment

☐ Remove loose items from ramp ☐ Suspend work at height

☐ Position aircraft into wind if possible ☐ Add extra chocks to aircraft

☐ Suspend cargo loading if winds exceed limits ☐ Brief all personnel

WINTER WEATHER PROCEDURES:

☐ Activate snow and ice plan ☐ Ensure deicing fluids stocked

☐ Pre-treat pavements ☐ Clear snow from critical areas

☐ Monitor pavement temperature ☐ Test friction measurements

☐ Brief deicing crews ☐ Coordinate with ATC on runway conditions

☐ Prepare for aircraft ground deicing ☐ Monitor holdover times

HOT WEATHER PROCEDURES:

☐ Activate heat stress program ☐ Provide additional water stations

☐ Schedule frequent breaks ☐ Monitor personnel for heat stress

☐ Provide cooling areas ☐ Adjust work schedules (early mornings)

☐ Monitor tire pressure ☐ Check aircraft performance calculations

☐ Ensure adequate ventilation ☐ Stock additional water on aircraft

Heat Stress Prevention Program

HEAT STRATEGY:

☐ Acclimatization program for new workers ☐ Work/rest cycles based on temperature

☐ Mandatory hydration (minimum 250ml every 20 min) ☐ Shaded rest areas available

☐ Electrolyte replacement available ☐ Cooling stations with fans/misters

☐ Light-colored, breathable uniforms encouraged ☐ Sunscreen provided

HEAT STRASS RISK LEVELS: TEMPERATURE ___________°C ___________°C ___________°CHUMIDITY ______% ______% ______%WBGT* _______°C _______°C _______°CRISK LEVEL ___ ___ ___WORK/REST CYCLE _________ min work / _________ min rest _________ min work / _________ min rest _________ min work / _________ min rest

*WBGT = Wet Bulb Globe Temperature

HEAT STRESS SYMPTOMS:

☐ Heat rash ☐ Heat cramps ☐ Heat exhaustion ☐ Heat stroke (medical emergency)

EMERGENCY PROCEDURES FOR HEAT STROKE:

1. Call emergency services immediately

2. Move person to cool area

3. Remove excess clothing

4. Cool with water, ice packs, fans

5. Monitor airway, breathing, circulation

Cold Weather/ Winter Operations Checklist

COLD STRESS PREVENTION:

☐ Layered clothing policy ☐ Insulated gloves available

☐ Warm break areas provided ☐ Hot beverages available

☐ Wind chill monitoring ☐ Frostbite awareness training

☐ Buddy system for cold weather work ☐ Work/rest cycles in extreme cold

DEICING OPERATIONS:

DEICING PAD INFORMATION:

Location: ______________ Capacity: ______ aircraft/hr Type: Central ☐ Gate ☐

Fluid Types: Type I ☐ Type II ☐ Type III ☐ Type IV ☐

Fluid Inventory: Type I: ______ L Type IV: ______ L Reorder Point: ______ L

Deicing Trucks: ______ available ______ operational

DEICING PROCEDURES:

☐ Pre-deicing inspection required ☐ Holdover time calculations performed

☐ Two-step process for active frost/snow ☐ Anti-icing applied after deicing

☐ Post-treatment inspection ☐ Documentation completed

COLD WEATHER APU/GPU OPERATIONS:

☐ Battery heaters operational ☐ Engine preheat procedures

☐ Ground power units winterized ☐ APU start limitations considered

Weather-Related Communication Protocols

WEATHER BRIEFINGS:

☐ Daily weather briefing at shift start ☐ Severe weather alerts broadcast

☐ Updates every ______ hours ☐ Special briefings for approaching systems

WEATHER DISSEMINATION: Recipient Group ________ Flight Crew Dispatchers Ramp Personnel Maintenance Ground Handlers Passenger Services ATCMethod ________ ________ ________ ________ ________ ________ ________ ________Frequency _________ _________ _________ _________ _________ _________ _________ _________Responsible ________ ________ ________ ________ ________ ________ ________ ________
WEATHER ESCALATION CRITERIA: Condition ________ ________ ________Action ________ ________ ________Responsible ________ ________ ________

Weather-Related Incident Reporting

WEATHER-RELATED INCIDENTS (LAST 12 MONTHS): Incident Type ________ Weather diversions Weather delays (>2 hrs) Lightning strikes Hail damage Wind-related GSE damage Flooding incidents Heat-related illnesses Cold-related illnesses Deicing-related incidentsNumber ______ ______ ______ ______ ______ ______ ______ ______ ______ ______Contributing Factors ________ ________ ________ ________ ________ ________ ________ ________ ________ ________Corrective Actions ________ ________ ________ ________ ________ ________ ________ ________ ________ ________

Weather Operations Action Plan

No.ACTION ITEMRESPONSIBLESTART DATEDUE DATESTATUS
1Upgrade lightning detection system to provide longer warning timesEngineering______________________☐ Not Started
☐ In Progress
☐ Completed
2Conduct severe weather drills for all ground personnelSafety Officer______________________☐ Not Started
☐ In Progress
☐ Completed
3Procure additional wind-resistant GSE tie-down equipmentFleet Manager______________________☐ Not Started
☐ In Progress
☐ Completed
4Review and update low visibility operating proceduresOperations Mgr______________________☐ Not Started
☐ In Progress
☐ Completed
5Install additional weather monitoring stations on rampFacilities Mgr______________________☐ Not Started
☐ In Progress
☐ Completed
6Implement enhanced heat stress prevention programHR / Safety______________________☐ Not Started
☐ In Progress
☐ Completed

Approvals

ASSESSMENT PREPARED BY:

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Chief Meteorologist):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Operations Manager):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

APPROVED BY (Director of Operations):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

More templates