Free Air Traffic Control Risk Assessment template for aviation you can edit online and download as PDF. Covers atc unit information, human factors in atc - shell model analysis, workload and staffing assessment.
ASSESSMENT ID: ATC-__________ DATE: ______________ TIME: ______________
FACILITY: ACC ☐ APP ☐ TWR ☐ FSS ☐ LOCATION: ______________ SECTOR: ______________
MANAGER: ______________ SAFETY SUPERVISOR: ______________ VALID UNTIL: ______________
TRAFFIC VOLUME: ______ movements/hr PEAK HOURS: ________ to ________
RADAR COVERAGE: Primary ☐ Secondary ☐ Both ☐ SURVEILLANCE: ADS-B ☐ MLAT ☐
| OCCURRENCE TYPE | CONTRIBUTORY FACTORS | CONSEQUENCE | EXISTING BARRIERS | PROBABILITY (1-5) | SEVERITY (1-5) | RISK INDEX |
|---|---|---|---|---|---|---|
| Loss of Separation | -High workload -Complex airspace -Frequency congestion -Coordination errors | -Mid-air collision -Near miss -RA -Emergency avoidance action | -STCA -TCAS -Traffic advisories -SOPs -Training -CRM | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Runway Incursion | -Clearance readback error -Pilot deviation -Vehicle on runway | -Collision -Fatalities -Aircraft damage -Evacuation | -Stop bars -RIMCAS -Surface movement radar -Phraseology -CRM | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Altitude Deviation (Level Bust) | -Pilot error -Readback error -Incorrect coordination -Transponder failure | -Loss of separation -CFIT -Violation | -MVA -STCA -Terrain awareness -CPA -Training -Briefings | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| ATC Operational Error | -System failure -Handover omission -Strip misplacement -Coordination breakdown | -Loss of separation -Flight delay -Workload spike | -Backup systems -Contingency plans -Manual procedures -Training | 3 (Occasional) | 3 (Major) | 9 (MEDIUM) |
| INTERFACE | STRENGTHS | WEAKNESSES | IMPROVEMENTS |
|---|---|---|---|
| Liveware - Software (L-S) | -Experienced controllers -Standardized procedures -Automated systems -Checklists | -High workload periods -Complex airspace design -Legacy systems with limitations | -Additional training -Procedure simplification |
| Liveware - Hardware (L-H) | -Ergonomic workstations -Quality headsets -Redundant systems | -Screen glare -Outdated radar displays -Slow system response | -Better lighting -Equipment upgrade |
| Liveware - Liveware (L-L) | -Good team coordination -Clear phraseology -Supportive supervision | -Communication barriers -Shift handover gaps -Personality conflicts | -Team-building -Standardized handovers |
| Liveware - Environment (L-E) | -Up-to-date charts -Weather displays -Alert systems | -Information overload -Distractions -Noise levels | -Display optimization -Noise reduction |
SECTOR CAPACITY:
Declared Capacity: ______ aircraft/hr Current Traffic: ______ aircraft/hr % Capacity: ______%
Peak Capacity: ______ aircraft/hr Sustainable Time: ______ minutes
STAFFING LEVELS:
Controllers on position: ______ Trainees: ______ Supervisors: ______
Positions staffed vs required: ______/______ Shortfall: ______
WORKLOAD ASSESSMENT:
TIME PERIOD | TRAFFIC VOLUME | COMPLEXITY | WORKLOAD (1-5) | COMMENTS
_____________ | ______________ | __________ | ______________ | ______________
_____________ | ______________ | __________ | ______________ | ______________
_____________ | ______________ | __________ | ______________ | ______________
FATIGUE FACTORS:
Shift Pattern: _______ Hours on position: _______ Breaks taken: _______
Time since break: _______ Time on shift: _______ Time since day off: _______
WORKLOAD RISK LEVEL: Low ☐ Medium ☐ High ☐ Critical ☐
SYSTEM | STATUS | REDUNDANCY | LAST FAILURE | MTBF (days) | NEXT MAINTENANCE
______________ | __________ | __________ | _____________ | ___________ | ______________
Radar Processing | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
Flight Data | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
Communications | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
Recording System | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
Weather Display | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
Backup Systems | Operational| Hot ☐ Cold☐ | _____________ | ___________ | ______________
SYSTEM OUTAGE HISTORY:
DATE | SYSTEM | DURATION | IMPACT | ACTION TAKEN
__________ | __________ | ________ | ______________ | ______________
__________ | __________ | ________ | ______________ | ______________
CONTINGENCY PLAN STATUS:
☐ Current ☐ Reviewed ☐ Exercised ☐ Distributed ☐ Understood by all
OBSERVATION PERIOD: ______________ OBSERVER: ______________
| COMMUNICATION ELEMENT | COMPLIANT | NON-COMPLIANT | OBSERVATIONS |
|---|---|---|---|
| Standard phraseology used Readbacks complete & correct Hearbacks performed Call sign usage correct Altitude/heading assignments Clearances unambiguous Coordination complete Frequency congestion managed Emergency phraseology | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ ________ ________ ________ |
COMMUNICATION ERROR TRENDS:
Most common errors: 1. ______________ 2. ______________ 3. ______________
COMMUNICATION RISK LEVEL: Low ☐ Medium ☐ High ☐
INTERNAL COORDINATION:
☐ Between sectors: Clear protocols ☐ Position relief: Standardized handover
☐ Supervisor coordination: Regular ☐ Shift change: Structured briefing
EXTERNAL COORDINATION:
☐ Adjacent ATC units: Agreed procedures ☐ Military: Civil-military coordination
☐ Airport operations: Regular liaison ☐ Flow management: Integrated
☐ Weather services: Real-time updates ☐ Airlines: As required
COORDINATION BREAKDOWNS:
DATE | PARTNER | ISSUE | RESOLUTION
__________ | ____________ | ______________ | ______________
__________ | ____________ | ______________ | ______________
CONTROLLER QUALIFICATIONS:
NAME | RATING | VALID UNTIL | LAST CHECK | OJT STATUS | COMMENTS
______________ | _____________ | ___________ | __________ | __________ | ______________
______________ | _____________ | ___________ | __________ | __________ | ______________
______________ | _____________ | ___________ | __________ | __________ | ______________
TRAINING COMPLETED:
TRAINING TYPE | COMPLETED | NEXT DUE | % COMPLETE
______________ | _________ | ________ | ________
Initial Qualification | ☐ | ________ | ______%
On-the-Job Training | ☐ | ________ | ______%
Annual Refresher | ☐ | ________ | ______%
Emergency Procedures | ☐ | ________ | ______%
Human Factors | ☐ | ________ | ______%
Safety Management | ☐ | ________ | ______%
New Equipment | ☐ | ________ | ______%
TRAINING RECORDS LOCATION: ______________ NEXT AUDIT: ______________
OBSERVER: ______________ DATE: ______________ TIME: ______________ SECTOR: ______________
| ITEM | OK | NOT OK | N/A | COMMENTS |
|---|---|---|---|---|
| 1. Position relief briefings adequate 2. Sector setup complete before taking over 3. Strips/flight data accurate and current 4. Scanning technique effective 5. Planning ahead (5-10 min) 6. Vectoring techniques appropriate 7. Altitude assignments correct 8. Speed control applied appropriately 9. Coordination complete and timely 10. Traffic information provided when needed 11. Weather information passed as required 12. Emergency equipment check complete 13. Phraseology standard and correct 14. Readbacks/hearbacks performed 15. Workload management effective | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
OBSERVATIONS: ______________
______________
FEEDBACK PROVIDED: Yes ☐ No ☐ FEEDBACK RECEIVED: Yes ☐ No ☐
| EMERGENCY SCENARIO | PROCEDURES KNOWN | RECENTLY PRACTICED | EQUIPMENT AVAILABLE | CONFIDENCE LEVEL |
|---|---|---|---|---|
| Aircraft emergency (mayday) | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Bomb threat | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Unlawful interference | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Radio failure | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Radar failure | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Communications failure | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Weather emergency | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| Facility evacuation | ☐ | ☐ | ☐ | 1 2 3 4 5 |
| REPORTING CULTURE ASSESSMENT: Question | Strongly Disagree | Disagree | Neutral | Agree | Strongly Agree |
|---|---|---|---|---|---|
| I feel comfortable reporting my own errors Management supports safety reporting Reports are acted upon I am not blamed for honest mistakes Lessons learned are shared | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ |
REPORTING STATISTICS:
Reports this month: ______ Year to date: ______ Compared to last year: +___ / -___
Most common report types: 1. ______________ 2. ______________ 3. ______________
JUST CULTURE IMPLEMENTATION:
☐ Policy in place ☐ Communicated ☐ Understood ☐ Applied consistently
| INDICATOR | TARGET | CURRENT | TREND | ACTION REQUIRED |
|---|---|---|---|---|
| Loss of separation (>1/3 of applicable separation) Runway incursions Altitude deviations (level busts) ATC operational errors Coordination errors Technical system outages (significant) Safety reports submitted Training currency | 0 0 <2 <1 <3 <2 >10 100% | ______ ______ ______ ______ ______ ______ ______ ______ | ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ | ________ ________ ________ ________ ________ ________ ________ ________ |
| No. | ACTION ITEM | RESPONSIBLE | START DATE | DUE DATE | STATUS |
|---|---|---|---|---|---|
| 1 | Conduct refresher training on STCA procedures | Training Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 2 | Review and update sector capacity limits based on workload study | Ops Supervisor | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 3 | Implement enhanced handover procedure between sectors | Safety Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 4 | Schedule radar simulator training on emergency scenarios | Training Dept | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
ASSESSMENT PREPARED BY:
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Safety Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Operations Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
APPROVED BY (Air Traffic Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________