Free Emergency Evacuation Risk Assessment template for aviation you can edit online and download as PDF. Covers emergency evacuation information, emergency evacuation risk assessment matrix, current arff capability vs requirements
ASSESSMENT ID: EVA-__________ DATE: ______________ TIME: ______________
AIRPORT: ______________ ICAO CODE: ______________ VALID UNTIL: ______________
AIRPORT CATEGORY: ____ (ICAO) ARFF MANAGER: ______________ ASSESSOR: ______________
ANNUAL MOVEMENTS: ______ MAX AIRCRAFT SIZE: ______________ MAX PAX: ______
ARFF VEHICLES: ______ ARFF PERSONNEL PER SHIFT: ______ RESPONSE TIME: ______ min
| SCENARIO | HAZARD | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (A-E) | RISK INDEX |
|---|---|---|---|---|---|---|
| Aircraft Accident on Airport | -Fire on aircraft -Fuel spill -Structural damage -Injuries | -Rapid fire spread -Multiple casualties -Airport closure -Public scrutiny | -ARFF response -Emergency plan -Training -Drills -Mutual aid agreements | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Aircraft Accident Off-Airport | -Uncontrolled fire -Difficult access -Terrain challenges -Unknown hazards | -Mass casualties -Difficult rescue -Extended response time | -Alerting system -Mutual aid agreements -Mobile command center -Helicopter support | 3 (Occasional) | E (Catastrophic) | 9 (HIGH) |
| Bomb Threat / Security Incident | -Explosion -Panic -Secondary devices -Uncontrolled evacuation | -Multiple fatalities -Aircraft loss -Airport shutdown | -Security procedures -Canine units -Evacuation plan -Training | 1 (Improbable) | E (Catastrophic) | 5 (MEDIUM) |
| Hazardous Materials Incident | -Toxic release -Fire/ explosion -Contamination | -Chemical exposure -Fatalities -Evacuation of nearby areas -Environmental damage | -HAZMAT response plan -Specialized equipment -Training -Decon procedures | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Natural Disaster | -Earthquake -Severe weather -Flooding -Volcanic ash | -Structural damage -Multiple casualties -Airport closure | -Emergency operations center -Continuity plan -Backup systems | 2 (Remote) | D (Hazardous) | 6 (MEDIUM) |
| Ground Emergency | -Ramp accident -GSE fire -Fuel truck collision -Building fire | -Multiple injuries -Fuel spill -Explosion -Aircraft damage | -Ramp procedures -Emergency response -Training -Drills -ARFF | 3 (Occasional) | D (Hazardous) | 9 (HIGH) |
AIRPORT CATEGORY: ____ (Based on longest aircraft)
CATEGORY
REQUIREMENTS: | |
| Category 1 Category 2 Category 3 Category 4 Category 5 Category 6 Category 7 Category 8 Category 9 Category 10 | < 9 m 9-12 m 12-18 m 18-24 m 24-28 m 28-39 m 39-49 m 49-61 m 61-76 m 76-90 m | < 2 m 2 m 2-3 m 3-4 m 4-5 m 5-7 m 7-8 m 8-9 m 9-10 m >10 m | 230 L water + 45 kg dry chemical or 230 L water + 135 L foam 670 L water + 90 kg dry chemical or 670 L water + 360 L foam 1,200 L water + 135 kg dry chemical or 1,200 L water + 900 L foam 2,400 L water + 135 kg dry chemical or 2,400 L water + 1,800 L foam 5,400 L water + 180 kg dry chemical or 5,400 L water + 3,600 L foam 8,200 L water + 225 kg dry chemical or 8,200 L water + 5,500 L foam 12,100 L water + 225 kg dry chemical or 12,100 L water + 7,900 L foam 18,200 L water + 225 kg dry chemical or 18,200 L water + 11,900 L foam 24,300 L water + 225 kg dry chemical or 24,300 L water + 15,900 L foam 32,400 L water + 225 kg dry chemical or 32,400 L water + 21,200 L foam |
|---|
| RESOURCE | REQUIRED | CURRENT | DEFICIT | COMPLIANT | ACTION REQUIRED |
|---|---|---|---|---|---|
| Water (L) Foam Concentrate (L) Dry Chemical (kg) ARFF Vehicles ARFF Personnel Response Time (min) Communication Eq Personal Protective Equipment Respiratory Protection Decontamination Equipment | _______ _______ _______ _______ _______ 3 min Required Required Required Required | _______ _______ _______ _______ _______ ______ ______ ______ ______ ______ | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
| ERP COMPONENT | IN PLACE | CURRENT | REVIEWED | DRILLED | RESPONSIBLE |
|---|---|---|---|---|---|
| Emergency Response Plan Document Alerting Procedures Command and Control Structure Emergency Operations Center Activation Mutual Aid Agreements Communication Protocols Passenger Assembly Areas Family Reception Centers Media Relations Plan Victim Identification Protocols Family Assistance Plan Business Continuity Plan Mutual Aid with Airlines | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | N/A ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | Emergency Planner ATC / Ops Incident Commander EOC Manager Emergency Planner Communications Officer Terminal Manager Customer Service Public Relations Coroner / Police Airline Liaison Operations Director Airline Coordinator |
| EXERCISE TYPE | FREQUENCY | LAST DATE | NEXT DATE | PARTICIPANTS | FINDINGS / ACTIONS |
|---|---|---|---|---|---|
| Full Scale Exercise (Regulatory) | 3 years | _________ | _________ | All agencies | ________ |
| Tabletop Exercise | Annual | _________ | _________ | Key staff | ________ |
| Functional Exercise (Communications) | 2 years | _________ | _________ | Response agencies | ________ |
| Aircraft Fire Drill | Quarterly | _________ | _________ | ARFF only | ________ |
| Hazmat Spill Drill | Semi- annual | _________ | _________ | ARFF/HAZMAT | ________ |
| Bomb Threat Drill | Annual | _________ | _________ | Security/ Airlines | ________ |
| Medical Mass Casualty Drill | 2 years | _________ | _________ | Medical/ Hospitals | ________ |
| Communication Exercise | Quarterly | _________ | _________ | All agencies | ________ |
| Ramp Emergency Drill | Semi- annual | _________ | _________ | Ground Handlers | ________ |
| EQUIPMENT | QUANTITY | LOCATION | STATUS | LAST INSPECT | NEXT DUE | OPERATIONAL | |
|---|---|---|---|---|---|---|---|
| ARFF Vehicles Foam Tenders Command Vehicles Ambulances Mass Casualty Trailers Decontamination Units Portable Generators Lighting Towers Communications Equipment First Aid Supplies Stretchers/Backboards Body Bags Rescue Tools (Jaws etc.) Thermal Imaging Cameras Gas Monitors | _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF | ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No |
| POSITION | CURRENT | REQUIRED | SHORTFALL | TRAINED | CERTIFIED | NEXT TRAINING |
|---|---|---|---|---|---|---|
| ARFF Officers ARFF Firefighters ARFF Driver/Operators Emergency Medical Personnel Incident Commanders Communications Officers Hazmat Specialists Police/Security Airport Operations Personnel Maintenance Staff | _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
| SYSTEM | PRIMARY | BACKUP | STATUS | LAST TEST | NEXT TEST | GAPS IDENTIFIED |
|---|---|---|---|---|---|---|
| ARFF Radio System Airport Ops Radio Police/Security Radio Emergency Alert System Public Address System Satellite Phones Cell Phone Backup Computer-Aided Dispatch Video Surveillance System Emergency Call Boxes | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF ☐ OK ☐ DEF | _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ | _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
| EMERGENCY ACCESS ROUTES: Route ________ ________ ________ | Location ________ ________ ________ | Width (m) _________ _________ _________ | Surface _______ _______ _______ | Condition _________ _________ _________ | Lighting ________ ________ ________ | Signage _______ _______ _______ | Last Inspected ________ ________ ________ |
|---|---|---|---|---|---|---|---|
| ASSEMBLY AREAS: Area ________ ________ ________ | Location ________ ________ ________ | Capacity ________ ________ ________ | Facilities __________ __________ __________ | Access ______ ______ ______ | Lighting ________ ________ ________ | Signage _______ _______ _______ | Last Inspected ________ ________ ________ |
| TRIAGE AREAS: Area ________ ________ | Location ________ ________ | Capacity ________ ________ | Access ______ ______ | Lighting ________ ________ | Equipment _________ _________ | Signage _______ _______ | Last Inspected ________ ________ |
INCIDENT COMMAND POST LOCATIONS:
Primary: ______________ Backup: ______________ Mobile: ☐ Yes ☐ No
| INDICATOR | TARGET | CURRENT | TREND | ACTION REQUIRED |
|---|---|---|---|---|
| ARFF Response Time (minutes) ARFF Personnel per shift ARFF Equipment readiness (%) Exercise completion (%) Training compliance (%) Mutual aid drills completed Communication system tests passed (%) Emergency route accessibility (%) Plan review currency (months) After-action reports completed (%) | 3.0 Req'd 100% 100% 100% Ann. 100% 100% <12 100% | ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ | ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
| No. | ACTION ITEM | RESPONSIBLE | START DATE | DUE DATE | STATUS |
|---|---|---|---|---|---|
| 1 | Conduct full-scale emergency exercise per regulatory requirements | Emergency Mgr | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 2 | Procure additional ARFF vehicle to address capability deficit | ARFF Chief | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 3 | Review and update Emergency Response Plan with all stakeholders | Emergency Mgr | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 4 | Install backup communication system in Emergency Operations Center | IT Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 5 | Conduct specialized HAZMAT training for ARFF personnel | Training Mgr | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 6 | Upgrade signage for emergency access routes and assembly areas | Facilities Mgr | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 7 | Establish mutual aid agreement with neighboring airports | Emergency Mgr | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
ASSESSMENT PREPARED BY:
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (ARFF Chief):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Airport Safety Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
APPROVED BY (Airport Director):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________