Free Aviation Fuel Handling Risk Assessment template for aviation you can edit online and download as PDF. Covers fueling operation information, comprehensive hazard analysis - bowtie methodology, fuel quality control checklist.
ASSESSMENT ID: FUL-__________ DATE: ______________ TIME: ______________
LOCATION: ______________ GATE: ________ BAY: ______________
FUEL FARM: ______________ FUEL SUPPLIER: ______________ HYDRANT: Yes ☐ No ☐
FUEL TYPE: Jet A-1 ☐ Jet A ☐ AVGAS ☐ JET B ☐ Other: ______________
QUANTITY: ______________ Litres/Gallons VEHICLE ID: ______________ OPERATOR: ______________
AMBIENT TEMP: ________°C WEATHER: ______________ WIND: ________ knots
| THREAT | TOP EVENT | CONSEQUENCES | PREVENTIVE BARRIERS | MITIGATING BARRIERS | LIKELIHOOD (1-5) | RISK LEVEL |
|---|---|---|---|---|---|---|
| Static Discharge | Fuel Ignition | -Fire/Explosion -Loss of life -Aircraft loss -Environmental damage | -Bonding cables -Grounding checks -Conductive hoses -Flow rate control | -Fire extinguishers -Emergency shutdown -Evacuation procedures -Foam system | 2 (Remote) | HIGH |
| Fuel Overfill / Overflow | Fuel Spill | -Environmental contamination -Fire hazard -Slip hazard -Costly cleanup -Regulatory fines -Flight delay | -Automatic shutoff -Sight glasses -Overfill protection devices -Training | -Spill containment kits -Absorbent materials -Drain covers -Clean-up procedures | 3 (Occasional) | HIGH |
| Fuel Contamination | Contaminated Fuel Delivery | -Engine damage -Power loss -In-flight shutdown -Accident | -Filter monitoring -Sample testing -Drain sampling -Supplier quality controls | -Engine monitoring -Fuel additives -Emergency procedures -Contingency plans | 2 (Remote) | MEDIUM |
| Vehicle Collision | Fuel Line Rupture | -Fuel release -Fire -Explosion -Injuries -Aircraft damage | -Vehicle routing -Speed limits -Wing walkers -Barriers -Training | -Emergency shutoff -Spill response -Isolation -Evacuation -Emergency shutdown | 4 (Probable) | HIGH |
| Human Error | Incorrect Procedure | -Fuel mismatch -Engine damage -Flight cancellation -Safety incident | -Training -Checklists -Dual verification -Supervisor oversight -Automated systems | -Emergency procedures -Engine monitoring -Contingency plans -Reporting system | 4 (Probable) | MEDIUM |
PRE-FUELING CHECKS:
☐ Fuel type confirmed with flight crew ☐ Quantity required confirmed
☐ Water drain checks performed (minimum 3 sumps) ☐ Filter/separator condition checked
☐ Sample taken and clear (no water, sediment) ☐ Fuel color/odor normal
☐ Bonding cable connected before fueling ☐ Vehicle grounding checked
☐ Fire extinguisher present and sealed ☐ No smoking signs posted
☐ Emergency shutoff location identified ☐ Communication with cockpit established
DURING FUELING:
☐ Bonding cable remains connected ☐ Flow rate monitored
☐ Personnel remain with vehicle ☐ Nozzle properly inserted
☐ Nozzle grounded to aircraft ☐ Pressure monitored
☐ Vehicle position monitored ☐ No leaks observed
☐ Quantity monitored (overfill prevention) ☐ Communication maintained
POST-FUELING:
☐ Final quantity confirmed with flight crew ☐ Fuel receipt signed
☐ Bonding cable disconnected after fueling ☐ Caps and covers secured
☐ Final sample taken (if required) ☐ Hose drained and stowed
☐ Vehicle moved safely from aircraft ☐ Area checked for spills
☐ Documentation completed ☐ Any discrepancies reported
IMMEDIATE ACTIONS:
1. STOP fueling immediately (emergency shutoff)
2. ISOLATE ignition sources (engine, APU, electrical)
3. EVACUATE area of unnecessary personnel
4. NOTIFY emergency services (airport fire department)
5. ASSESS spill size and direction
6. CONTAIN spill using available materials
7. REPORT to supervisor and operations
SPILL CLASSIFICATION:
☐ MINOR (< 5 liters) - Handle locally with spill kit
☐ MODERATE (5-200 liters) - Airport fire department response
☐ MAJOR (>200 liters) - Full emergency response, possible runway closure
SPILL KIT LOCATIONS:
Location 1: ______________ Contents: ______________ Last checked: ______________
Location 2: ______________ Contents: ______________ Last checked: ______________
REPORTING REQUIREMENTS:
☐ Airport authority ☐ Environmental agency ☐ Regulatory body
☐ Fuel supplier ☐ Insurance company ☐ Internal safety
EMERGENCY CONTACTS:
Airport Fire: ______________ Airport Police: ______________ Fuel Desk: ______________
Environmental: ______________ Safety Manager: ______________ Operations: ______________
FIRE EXTINGUISHER REQUIREMENTS:
Type: CO2 ☐ Dry Chemical ☐ Foam ☐ Rating: ______________ Quantity: ______________
Location: ______________ Last Inspection: ______________ Next Due: ______________
FIRE PRECAUTIONS:
☐ No smoking within 15m of fueling area ☐ No cell phone use
☐ No running engines/APU during fueling ☐ No electrical equipment
☐ No open flames or sparks ☐ No hot work within 30m
☐ Aircraft brakes set ☐ Wheel chocks in place
☐ Ground power connected correctly ☐ No passengers boarding/disembarking
FUELING DURING THUNDERSTORMS:
☐ Cease fueling if lightning within 5 nautical miles
☐ Wait 30 minutes after last observed lightning
☐ Monitor weather radar continuously
☐ Have emergency plan ready
| ACTIVITY | FR Clothing | Safety Glasses | Chemical Resistant Apron | Steel Toe Boots | Hearing Protection | Gloves (Fuel Resistant) | Other |
|---|---|---|---|---|---|---|---|
| Fuel Delivery | ☐ | ☐ | ☐ | ||||
| Fuel Pumping | ☐ | ☐ | |||||
| Sample Collection | ☐ | ¹ | |||||
| Spill Response | ☐ | ² |
¹ Face shield ² Rubber boots
MANDATORY TRAINING:
☐ Initial fuel handling course (40 hours) ☐ Annual refresher (8 hours)
☐ Dangerous goods awareness ☐ Fire fighting training
☐ Spill response training ☐ First aid / CPR
☐ Emergency procedures ☐ Customer service (optional)
COMPETENCY ASSESSMENT:
☐ Written exam (pass mark: 80%) ☐ Practical demonstration
☐ Supervisor observation period (2 weeks) ☐ Sign-off by qualified trainer
CERTIFICATION:
Certificate #: ______________ Issue Date: ______________ Expiry Date: ______________
Issuing Authority: ______________ Level: Basic ☐ Advanced ☐ Supervisor ☐
TRAINING RECORDS LOCATION: ______________ Next Audit: ______________
DAILY PRE-USE INSPECTION:
☐ Tires condition and pressure ☐ Brakes function properly
☐ Lights all working ☐ Reverse alarm operational
☐ Hoses no cracks/leaks ☐ Nozzle in good condition
☐ Filters clean ☐ Gauges functioning
☐ Emergency shutoff tested ☐ Bonding cables intact
☐ Fire extinguisher present and charged ☐ Spill kit complete
☐ Fuel level sufficient ☐ Documentation on board
WEEKLY INSPECTION:
☐ Filter/separator condition ☐ Water drain checks
☐ Hose pressure test due date ☐ Calibration certificates
☐ Vehicle maintenance records ☐ Safety equipment inventory
DEFECT REPORTING:
Any defects found? Yes ☐ No ☐ If yes, reported to: ______________ Date: ______________
Defect description: ______________
INSPECTED BY: ______________ Date: ______________ Time: ______________
SECONDARY CONTAINMENT:
☐ Fuel farm bunded to 110% capacity ☐ Drain valves locked closed
☐ Spill pallets under drums ☐ Absorbent materials available
☐ Regular integrity checks ☐ Rainwater removal procedures
STORMWATER PROTECTION:
☐ Drain covers available ☐ Spill response plan includes drains
☐ Drain maps posted ☐ Regular drain inspections
WASTE MANAGEMENT:
☐ Used oil collected properly ☐ Filters disposed correctly
☐ Absorbent materials disposed as hazardous ☐ Waste manifests maintained
☐ Licensed waste contractor: ______________
ENVIRONMENTAL PERMITS:
Permit #: ______________ Expiry: ______________ Agency: ______________
OBSERVATION LOG:
DATE | OBSERVER | OBSERVATION | ACTION TAKEN | STATUS
__________ | __________ | ______________ | ______________ | ______________
__________ | __________ | ______________ | ______________ | ______________
__________ | __________ | ______________ | ______________ | ______________
NEAR MISS REPORTING:
Near Misses This Month: ______ Reported: ______ Investigated: ______ Closed: ______
INCIDENT TRENDS:
Most common incidents: 1. ______________ 2. ______________ 3. ______________
Most common causes: 1. ______________ 2. ______________ 3. ______________
STANDARD | REQUIREMENT | COMPLIANT | EVIDENCE LOCATION
______________ | ______________ | _________ | ______________
JIG 1 (Joint Inspection) | Fuel quality management system | ☐ Yes ☐ No | ______________
EI 1540 | Aviation fuel handling procedures | ☐ Yes ☐ No | ______________
API 1540 | Mobile aviation fueling | ☐ Yes ☐ No | ______________
NFPA 407 | Aircraft fueling fire safety | ☐ Yes ☐ No | ______________
ICAO Annex 14 | Airport fueling areas | ☐ Yes ☐ No | ______________
Local Regulations | ______________ | ☐ Yes ☐ No | ______________
AUDIT HISTORY:
Last Audit Date: ______________ Auditor: ______________ Score: ______________
Findings: ______________ Corrective Actions: ______________ Closed: ______________
Next Audit Date: ______________
| No. | ITEM | RESPONSIBLE | TARGET DATE | COMPLETION DATE | STATUS |
|---|---|---|---|---|---|
| 1 | Upgrade bonding cable inspection frequency | Fuel Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 2 | Install additional overfill protection devices | Engineering | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 3 | Conduct refresher training for all fuel handlers | Training Dept | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 4 | Review and update emergency response plan | Safety Officer | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
ASSESSMENT PREPARED BY:
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Fuel Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Safety Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
APPROVED BY (Operations Director):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________