Free Risk Assessment template you can edit online and download as PDF. Covers assessment information, 1.0 scope & objectives, 2.0 hazard identification.
ASSESSMENT ID: RA-__________ DATE: ______________ REVISION: ______________
PROJECT/ACTIVITY: ______________ LOCATION: ______________
ASSESSOR: ______________ APPROVED BY: ______________
ASSESSMENT TYPE: ☐ Project ☐ Activity ☐ Task ☐ Job ☐ Process ☐ Site ☐ Equipment
SCOPE: ______________
______________
OBJECTIVES:
1. ______________
2. ______________
3. ______________
HAZARD CATEGORIES:
☐ Physical Hazards: ______________
☐ Chemical Hazards: ______________
☐ Biological Hazards: ______________
☐ Ergonomic Hazards: ______________
☐ Psychological Hazards: ______________
☐ Environmental Hazards: ______________
☐ Electrical Hazards: ______________
☐ Mechanical Hazards: ______________
IDENTIFIED HAZARDS:
#
| 1. 2. 3. 4. 5. | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ |
|---|
RISK ASSESSMENT MATRIX:
SEVERITY
↑
5
| 4 | 4 | 8 | 12 | 16 | 20 | |
|---|---|---|---|---|---|---|
| 3 | 3 | 6 | 9 | 12 | 15 | |
| 2 | 2 | 4 | 6 | 8 | 10 |
1
───── ───── ───── ───── ───── ─────────────────────────────────────────────────────────→ PROBABILITY
1 2 3 4 5
SEVERITY RATING:
1 = Minor (First aid, minor disruption)
2 = Moderate (Medical treatment, temporary impact)
3 = Serious (Lost time injury, significant impact)
4 = Major (Permanent disability, major disruption)
5 = Catastrophic (Fatality, business closure)
PROBABILITY RATING:
1 = Rare (Unlikely to occur)
2 = Unlikely (Possible but not expected)
3 = Possible (May occur occasionally)
4 = Likely (Will occur under normal conditions)
5 = Almost Certain (Frequent occurrence)
RISK LEVELS:
1-4 = LOW - Acceptable, maintain controls
5-9 = MEDIUM - Manageable, require monitoring
10-15 = HIGH - Significant, urgent action required
16-25 = CRITICAL - Unacceptable, stop work until controls implemented
| # | HAZARD | SEVERITY | PROBABILITY | RISK SCORE | RISK LEVEL | EXISTING CONTROLS |
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ | __________ __________ __________ __________ __________ | __________ __________ __________ __________ __________ | __________ __________ __________ __________ __________ | ________ ________ ________ ________ ________ |
HIERARCHY OF CONTROLS (Most Effective → Least Effective):
1. ELIMINATION: Remove the hazard completely
☐ Action: ______________
2. SUBSTITUTION: Replace with less hazardous alternative
☐ Action: ______________
3. ENGINEERING CONTROLS: Physical changes to work environment
☐ Guarding: ______________
☐ Ventilation: ______________
☐ Isolation: ______________
☐ Automation: ______________
4. ADMINISTRATIVE CONTROLS: Changes to work practices
☐ Procedures: ______________
☐ Training: ______________
☐ Signage: ______________
☐ Permits: ______________
☐ Supervision: ______________
5. PERSONAL PROTECTIVE EQUIPMENT: Last line of defense
☐ PPE Required: ______________
PROPOSED CONTROLS:
#
| 1 2 3 | ________ ________ ________ | ________ ________ ________ | ________ ________ ________ | _____________ _____________ _____________ | ________ ________ ________ |
|---|
After implementing controls, reassess risk:
| # | HAZARD | NEW SEVERITY | NEW PROBABILITY | NEW RISK SCORE | NEW RISK LEVEL | STATUS |
|---|---|---|---|---|---|---|
| 1 2 3 | ________ ________ ________ | _____________ _____________ _____________ | ________ ________ ________ | ________ ________ ________ | ________ ________ ________ | ☐ Accept ☐ Reject ☐ Accept ☐ Reject ☐ Accept ☐ Reject |
ACCEPTABILITY:
☐ All risks reduced to ALARP (As Low As Reasonably Practicable)
☐ Further controls required: ______________
☐ Risk acceptance approved by management
MONITORING PLAN:
☐ Regular inspections: Frequency: ______________ Responsible: ______________
☐ Performance monitoring: Method: ______________ Responsible: ______________
☐ Incident tracking: ______________
REVIEW SCHEDULE:
☐ Review after significant changes
☐ Review after incidents/near misses
☐ Annual review: Next review date: ______________
REVIEW LOG:
DATE
| _____________ _____________ | ________ ________ | ________ ________ | ________ ________ | ________ ________ |
|---|
RISK ASSESSMENT APPROVED BY:
ASSESSOR: ______________ SIGNATURE: ______________ DATE: ______________
SUPERVISOR: ______________ SIGNATURE: ______________ DATE: ______________
SAFETY MANAGER: ______________ SIGNATURE: ______________ DATE: ______________
MANAGEMENT: ______________ SIGNATURE: ______________ DATE: ______________
COMMUNICATION PLAN:
☐ Communicated to affected employees: Date: ______________ Method: ______________
☐ Training provided: Date: ______________ Trainer: ______________
☐ Controls documented in work procedures
☐ Emergency procedures updated
DISTRIBUTION:
☐ Operations ☐ Safety ☐ Maintenance ☐ HR ☐ Contractors ☐ Other: ______________