Maintenance Activities Risk Assessment template

Free Maintenance Activities Risk Assessment template for education you can edit online and download as PDF. Covers maintenance activities information, lockout/tagout (loto) procedures, hot work permit.

Maintenance Activities Information

ASSESSMENT ID: MAINT-__________ DATE: ______________ TIME: ______________

SCHOOL: ______________ FACILITIES MANAGER: ______________

MAINTENANCE SUPERVISOR: ______________ # OF MAINTENANCE STAFF: ______

CONTRACTORS ON SITE? ☐ Yes ☐ No If yes, company: ______________

WORK BEING PERFORMED: ______________

Maintenance Activities Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Falls from Heights (Ladders, Scaffolds, Roofs)-Unstable ladders
-Improper ladder setup
-Missing guardrails
-Unprotected roof edges
-Slippery surfaces
-Inadequate fall arrest system
-Fractures
-Head injuries
-Paralysis
-Fatality
-Guardrails on elevated platforms
-Ladder inspection program
-Fall protection (harness, lanyard)
-Scaffold inspection
-Ladder safety training
4 (Probable)5 (Catastrophic)20 (EXTREME)
Electrical Shock/Arc Flash-Live work
-Lack of lockout/tagout
-Improper PPE
-Damaged tools
-Wet conditions
-Hidden energized circuits
-Electrocution
-Burns
-Arc flash
-Cardiac arrest
-Fatality
-Lockout/ Tagout procedures
-PPE (voltage- rated gloves, face shield)
-Insulated tools
-De- energize before work
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Confined Spaces (Boilers, Tanks, Vaults)-Oxygen deficiency
-Toxic atmosphere
-Flammable atmosphere
-Engulfment
-No rescue plan
-Asphyxiation
-Toxic exposure
-Explosion
-Entrapment
-Fatality
-Permit- required confined space program
-Atmo- spheric testing
-Ventilation
-Attendant outside
-Rescue equipment
1 (Rare)5 (Catastrophic)5 (MEDIUM)
Chemical Exposure-Cleaning chemicals
-Paints/ solvents
-Pesticides
-Asbestos (older buildings)
-Lead paint disturbance
-Chemical burns
-Respiratory damage
-Poisoning
-Long-term health effects
-Cancer
-Hazard communi- cation program
-SDS available
-PPE (gloves, goggles, respirator)
-Ventilation
-Spill cleanup materials
3 (Occasional)4 (Critical)12 (HIGH)
Heavy Equipment/ Machinery-Improper operation
-Lack of training
-Missing guards
-Unmaintained equipment
-Blind spots
-Crush injuries
-Amputations
-Struck by
-Fatality
-Equipment inspection
-Operator training
-Guards in place
-Lockout/ Tagout
-Spotter for backup
-Exclusion zones
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Slips, Trips, Falls (Same Level)-Cluttered work areas
-Wet floors
-Cords/hoses across walkways
-Poor lighting
-Uneven surfaces
-Weather (ice, rain)
-Fractures
-Head injuries
-Sprains
-Bruises
-House- keeping program
-Spill cleanup supplies
-Clear walkways
-Warning signs
-Non-slip footwear
5 (Frequent)3 (Moderate)15 (EXTREME)
Hot Work (Welding, Grinding, Soldering)-Welding
-Cutting
-Grinding
-Open flames
-Sparks
-Combustibles nearby
-Improper PPE
-Fire
-Burns
-Explosion
-Eye injury
-Fumes inhalation
-Hot work permit system
-Fire watch
-Fire extinguisher nearby
-Clear area of com- bustibles
-Welding screens
-PPE (welding helmet, leathers)
2 (Remote)5 (Catastrophic)10 (HIGH)
Ladder Safety-Using damaged ladders
-Wrong ladder type for job
-Overreaching
-Unstable setup
-No 3-point contact
-Metal ladder near electri- cal sources
-Falls
-Fractures
-Head injuries
-Sprains
-Ladder inspection program
-Proper ladder selection
-Ladder training
-3-point contact maintained
-Non- conductive ladders near electrics
4 (Probable)4 (Critical)16 (EXTREME)
Student/Staff Exposure to Hazards-Work in occupied areas
-No barriers
-No warning signs
-Work during school hours
-Unsecured tools/ materials
-Student injury
-Chemical exposure
-Noise exposure
-Trips/falls
-Barricades
-Warning signs
-Schedule work during off-hours when possible
-Notify staff of work areas
-Secure tools/ materials
4 (Probable)4 (Critical)16 (EXTREME)

Lockout/Tagout (Loto) Procedures

ENERGY SOURCES:

☐ Electrical

☐ Mechanical

☐ Hydraulic

☐ Pneumatic

☐ Chemical

☐ Thermal

☐ Stored energy (springs, capacitors, gravity)

LOTO PROCEDURE STEPS:

1. Notify affected employees

2. Shut down equipment using normal procedure

3. Isolate energy sources (disconnect, valve, etc.)

4. Apply lock and tag

5. Release stored energy

6. Verify isolation - test equipment

7. Perform service/maintenance

8. Remove tools, guards, etc.

9. Notify affected employees

10. Remove lock and tag

11. Restore energy and test

LOTO EQUIPMENT INVENTORY:

☐ Locks (each employee has personal lock)

☐ Tags (durable, attached)

☐ Lock hasps (for multiple locks)

☐ LOTO procedure written for each equipment

ANNUAL LOTO AUDIT:

Date of last audit: ______________ Auditor: ______________

Findings: ______________

LOTO TRAINING:

Authorized employees (perform LOTO): ______________ # trained: ______

Affected employees (work near equipment): ______________ # trained: ______

Other employees: ______________ # trained: ______

Hot Work Permit

HOT WORK PERMIT - REQUIRED FOR: Welding, cutting, grinding, soldering, torch use, any open flame

DATE: ______________ TIME START: ______________ TIME END: ______________

LOCATION: ______________

WORK DESCRIPTION: ______________

PERFORMED BY: ______________ COMPANY: ______________

CHECK BEFORE STARTING WORK:

☐ Area clear of combustibles (35 ft radius)

☐ Floors swept clean, wet down if necessary

☐ Combustible floors/furnishings protected (fire-resistant blankets)

☐ Wall/ceiling openings covered (to prevent spark travel)

☐ Fire extinguisher (ABC) in work area (charged, inspected)

☐ Fire hose available (if required)

☐ Sprinkler system in service (if applicable)

☐ Ventilation adequate (for fumes)

☐ PPE available and worn (welding helmet, gloves, leathers, etc.)

☐ Fire watch assigned and trained

☐ Area posted: "HOT WORK IN PROGRESS"

FIRE WATCH:

Name: ______________ Time: ______________

Responsibilities:

• Remain in area during hot work and for 30 minutes after completion

• Watch for fires/smoke

• Have fire extinguisher ready

• Stop work if unsafe conditions develop

• Know how to sound alarm and call 911

PERMIT ISSUED BY: ______________ SIGNATURE: ______________

POST-WORK CHECK (30 MINUTES AFTER COMPLETION):

☐ No smoldering fires

☐ No hot spots

☐ Area safe

Fire watch signature: ______________ Time: ______________

Confined Space Entry

CONFINED SPACE PERMIT - REQUIRED FOR entry into: tanks, vaults, pits, boilers, manholes, crawlspaces

DATE: ______________ ENTRY TIME: ______________ EXIT TIME: ______________

LOCATION: ______________

PURPOSE OF ENTRY: ______________

ENTRANT(S): ______________

ATTENDANT: ______________

ENTRY SUPERVISOR: ______________

ATMOSPHERIC TESTING (BEFORE ENTRY AND CONTINUOUSLY):

TEST | ACCEPTABLE RANGE | INITIAL TEST | TIME | RETEST | TIME | RETEST | TIME | PASS?

______________ | ______________ | ____________ | ____ | ______ | ____ | ______ | ____ | ______

Oxygen | 19.5% - 23.5% | ____________ | ____ | ______ | ____ | ______ | ____ | ______

Flammable (LEL)| < 10% LEL | ____________ | ____ | ______ | ____ | ______ | ____ | ______

CO | < 35 ppm | ____________ | ____ | ______ | ____ | ______ | ____ | ______

H2S | < 10 ppm | ____________ | ____ | ______ | ____ | ______ | ____ | ______

Other: _______ | ______________ | ____________ | ____ | ______ | ____ | ______ | ____ | ______

EQUIPMENT CHECK:

☐ Ventilation equipment in place and operating

☐ Lighting (explosion-proof if required)

☐ Harness and lifeline for entrant

☐ Tripod/winch for retrieval

☐ Rescue equipment available

☐ Communication equipment (radio, etc.)

☐ PPE (as required)

☐ Lockout/Tagout applied

☐ Barricades/signs in place

ATTENDANT:

• Remain at entry point at all times

• Maintain communication with entrant

• Do not perform other duties

• Monitor for hazardous conditions

• Summon rescue if needed

ENTRY SUPERVISOR AUTHORIZATION:

I verify that all conditions for safe entry have been met.

Signature: ______________ Date: ______________

POST-ENTRY CHECK:

All entrants accounted for? ☐ Yes ☐ No Space secured? ☐ Yes ☐ No

Ladder Safety Inspection

LADDER INSPECTION CHECKLIST - Monthly

LADDER ID #: ______ TYPE: ☐ Step ☐ Extension ☐ Platform ☐ A-frame MATERIAL: ☐ Fiberglass ☐ Aluminum ☐ Wood

INSPECTION ITEMS:

☐ No cracks, splits, or bends

☐ All rungs/steps secure and slip-resistant

☐ No missing or loose hardware (rivets, bolts)

☐ Spreaders/locking mechanisms functional

☐ Ropes/pulleys in good condition (extension ladders)

☐ Locks engage properly

☐ Feet/slip-resistant pads in good condition

☐ No oil/grease on ladder

☐ Labels legible

☐ Not painted (wood ladders)

INSPECTION LOG:

DATE | LADDER ID | INSPECTED BY | CONDITION | DEFICIENCIES | CORRECTIVE ACTION | DATE CORRECTED

________ | _________ | ____________ | _________ | _____________ | ______________ | ______________

________ | _________ | ____________ | _________ | _____________ | ______________ | ______________

________ | _________ | ____________ | _________ | _____________ | ______________ | ______________

LADDER USE TIPS:

☐ Maintain 3-point contact

☐ Do not stand on top 2 rungs (step ladders) or top 4 rungs (extension)

☐ Set up on firm, level surface

☐ Do not overreach - move ladder

☐ Face ladder when climbing

☐ Secure extension ladders (top/bottom)

☐ Set angle: 1:4 ratio (1 ft out for every 4 ft up)

☐ Do not use metal ladders near electrical

Personal Protective Equipment (Ppe)

PPE HAZARD ASSESSMENT:

Date of last PPE assessment: ______________ Assessor: ______________

TASK-SPECIFIC PPE REQUIREMENTS:

TASK | HEAD | EYE | HEARING | RESPIRATORY | HAND | FOOT | BODY | FALL

______________ | ____ | ___ | _______ | ___________ | ____ | ____ | ____ | ____

Electrical work | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐

(Arc Flash) | (Class E) | | | (Arc rated) | | | |

Carpentry/Construction | ☐ | ☐ | ☐ | ☐ (dust) | ☐ | ☐ | ☐ | ☐ (heights)

Painting | ☐ | ☐ | ☐ | ☐ (organic | ☐ | ☐ | ☐ | ☐ (heights)

| | | | vapor) | | | |

Welding/Cutting | ☐ | ☐ | ☐ | ☐ (fumes) | ☐ | ☐ | ☐ | ☐ (heights)

| (welding hood) | | | (leather) | | (leather) |

Chemical Handling | ☐ | ☐ | ☐ | ☐ (as | ☐ | ☐ | ☐ | ☐

| | (chemical | | needed) | (chemical | (chemical | (chemical |

| | goggles) | | | resistant)| resistant)| resistant)|

Grounds Maintenance | ☐ | ☐ | ☐ | ☐ (dust) | ☐ | ☐ | ☐ | ☐

| (sun protection)| | | | | | (hi-vis) |

Roof Work | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ (full arrest)

PPE INSPECTION LOG:

PPE TYPE | LOCATION | LAST INSPECTED | CONDITION | NEEDS REPLACEMENT? | SIGNATURE

___________ | ________ | ______________ | _________ | ______________ | __________

___________ | ________ | ______________ | _________ | ______________ | __________

___________ | ________ | ______________ | _________ | ______________ | __________

RESPIRATOR FIT TESTING:

EMPLOYEE NAME | RESPIRATOR TYPE | FIT TEST DATE | NEXT DUE | MEDICAL EVAL? | SIGNATURE

_____________ | ______________ | _____________ | ________ | _____________ | __________

_____________ | ______________ | _____________ | ________ | _____________ | __________

Chemical Handling & Hazcom

HAZARD COMMUNICATION PROGRAM:

☐ Written HazCom program

☐ Chemical inventory maintained

☐ SDS accessible to all staff

☐ All containers labeled

☐ Staff trained on chemical hazards

☐ Non-routine task procedures

CHEMICAL STORAGE:

☐ Chemicals stored by compatibility

☐ Flammables in flammable cabinet

☐ Corrosives in corrosive cabinet

☐ No chemicals stored above eye level

☐ Secondary containment for liquids

☐ Shelving secure and grounded (if needed)

☐ Ventilation adequate

☐ Spill kit available and stocked

☐ No food/drink in chemical storage

SPILL RESPONSE:

Spill kit location: ______________

Spill kit contains:

☐ Absorbent materials

☐ Neutralizers (acid/base)

☐ PPE (gloves, goggles, apron)

☐ Disposal bags/containers

☐ Dustpan/broom

☐ Sealing tape

SPILL PROCEDURE:

1. Assess risk - evacuate if necessary

2. Don appropriate PPE

3. Contain spill (absorbents, dikes)

4. Neutralize if appropriate

5. Clean up using proper tools

6. Place waste in labeled container

7. Dispose of waste properly

8. Report spill to supervisor

9. Restock spill kit

SPILL LOG:

DATE | CHEMICAL | QUANTITY | LOCATION | RESPONDER | CLEANUP METHOD | DISPOSAL

________ | ________ | ________ | ________ | _________ | ______________ | ________

________ | ________ | ________ | ________ | _________ | ______________ | ________

Powered Industrial Trucks (Forklifts, Etc.)

EQUIPMENT INVENTORY:

EQUIPMENT TYPE | MODEL | SERIAL # | OWNED/LEASED | LAST INSPECTION | NEXT DUE

______________ | _____ | ________ | ____________ | ______________ | ___________

______________ | _____ | ________ | ____________ | ______________ | ___________

OPERATOR REQUIREMENTS:

☐ Certified/trained operators only

☐ Certification current

☐ Evaluation every 3 years minimum

☐ Pre-use inspection completed

DAILY INSPECTION CHECKLIST:

☐ Tires (condition, pressure)

☐ Forks (no cracks, straight)

☐ Mast/chain (lubricated, no damage)

☐ Safety guards in place

☐ Lights/alarms functioning

☐ Seat belt present/functional

☐ Brakes operational

☐ Steering operational

☐ Hydraulic system (no leaks)

☐ Battery/fuel level

☐ Horn/backup alarm functioning

OPERATING RULES:

• Seat belt always worn

• No passengers

• Load within capacity

• Travel with load low (4-6 inches)

• Sound horn at intersections/blind corners

• No speeding

• Maintain safe distance

• Watch for pedestrians

• Use spotter in tight areas

• No horseplay

• Park with forks down, neutral, brake set

TRAINING RECORDS:

OPERATOR NAME | CERT DATE | EVAL DATE | TRAINER | RECERT DUE

_____________ | _________ | _________ | _______ | ___________

_____________ | _________ | _________ | _______ | ___________

Hand & Power Tool Safety

TOOL INSPECTION CHECKLIST:

☐ Tools inspected before each use

☐ Damaged tools removed from service

☐ Electrical cords intact (no fraying, exposed wires)

☐ Plugs intact (no missing prongs)

☐ Guards in place

☐ Safety switches operational

☐ Bits/blades sharp and in good condition

☐ No makeshift repairs

POWER TOOL SAFETY RULES:

• Disconnect when not in use, before servicing, when changing blades

• Keep cords away from heat, oil, sharp edges

• Do not carry by cord

• Use GFCI on all power tools

• Use proper tool for the job

• Wear appropriate PPE

• Secure work with clamps/vise - not hands

• No distractions while using tools

TOOL INVENTORY & INSPECTION LOG:

TOOL | ID # | LAST INSPECTED | CONDITION | DEFICIENCIES | CORRECTIVE ACTION | SIGNATURE

____ | ____ | ______________ | _________ | _____________ | ______________ | __________

____ | ____ | ______________ | _________ | _____________ | ______________ | __________

Working With Students Present

When maintenance must occur during school hours:

BEFORE WORK BEGINS:

☐ Notify principal/administration

☐ Notify teachers in affected areas

☐ Post warning signs at all access points

☐ Set up barricades/tape to restrict access

☐ Secure tools and materials when not in use

☐ Store chemicals in locked area

DURING WORK:

☐ Maintain barriers throughout work

☐ Never leave hazards unguarded

☐ Keep work area clean - no trip hazards

☐ Control dust (wet methods, vacuums, barriers)

☐ Control noise - schedule loud work when students not present if possible

☐ Do not allow students in work area

☐ Be aware of students nearby

☐ Communicate with staff about any changes

AFTER WORK:

☐ Clean up thoroughly

☐ Remove all barriers/signs when area is safe

☐ Inspect area for hazards before reopening

☐ Notify staff area is safe to use

SPECIAL CONSIDERATIONS:

☐ Asbestos/lead work requires special procedures - cannot be done with students present

☐ Major renovations should be scheduled during breaks

☐ Pest control applications require notification and may require relocation

Maintenance Activities Action Plan

DEFICIENCY (from inspection or incident) | CORRECTIVE ACTION | RESPONSIBLE | DUE DATE | STATUS

______________ | ______________ | ____________ | ________ | ______

______________ | ______________ | ____________ | ________ | ______

______________ | ______________ | ____________ | ________ | ______

______________ | ______________ | ____________ | ________ | ______

FACILITIES MANAGER SIGNATURE: ______________ DATE: ______________

PRINCIPAL REVIEW:

Signature: ______________ Date: _____________

More templates