Free Maintenance Activities Risk Assessment template for education you can edit online and download as PDF. Covers maintenance activities information, lockout/tagout (loto) procedures, hot work permit.
ASSESSMENT ID: MAINT-__________ DATE: ______________ TIME: ______________
SCHOOL: ______________ FACILITIES MANAGER: ______________
MAINTENANCE SUPERVISOR: ______________ # OF MAINTENANCE STAFF: ______
CONTRACTORS ON SITE? ☐ Yes ☐ No If yes, company: ______________
WORK BEING PERFORMED: ______________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Falls from Heights (Ladders, Scaffolds, Roofs) | -Unstable ladders -Improper ladder setup -Missing guardrails -Unprotected roof edges -Slippery surfaces -Inadequate fall arrest system | -Fractures -Head injuries -Paralysis -Fatality | -Guardrails on elevated platforms -Ladder inspection program -Fall protection (harness, lanyard) -Scaffold inspection -Ladder safety training | 4 (Probable) | 5 (Catastrophic) | 20 (EXTREME) |
| Electrical Shock/Arc Flash | -Live work -Lack of lockout/tagout -Improper PPE -Damaged tools -Wet conditions -Hidden energized circuits | -Electrocution -Burns -Arc flash -Cardiac arrest -Fatality | -Lockout/ Tagout procedures -PPE (voltage- rated gloves, face shield) -Insulated tools -De- energize before work | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Confined Spaces (Boilers, Tanks, Vaults) | -Oxygen deficiency -Toxic atmosphere -Flammable atmosphere -Engulfment -No rescue plan | -Asphyxiation -Toxic exposure -Explosion -Entrapment -Fatality | -Permit- required confined space program -Atmo- spheric testing -Ventilation -Attendant outside -Rescue equipment | 1 (Rare) | 5 (Catastrophic) | 5 (MEDIUM) |
| Chemical Exposure | -Cleaning chemicals -Paints/ solvents -Pesticides -Asbestos (older buildings) -Lead paint disturbance | -Chemical burns -Respiratory damage -Poisoning -Long-term health effects -Cancer | -Hazard communi- cation program -SDS available -PPE (gloves, goggles, respirator) -Ventilation -Spill cleanup materials | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Heavy Equipment/ Machinery | -Improper operation -Lack of training -Missing guards -Unmaintained equipment -Blind spots | -Crush injuries -Amputations -Struck by -Fatality | -Equipment inspection -Operator training -Guards in place -Lockout/ Tagout -Spotter for backup -Exclusion zones | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Slips, Trips, Falls (Same Level) | -Cluttered work areas -Wet floors -Cords/hoses across walkways -Poor lighting -Uneven surfaces -Weather (ice, rain) | -Fractures -Head injuries -Sprains -Bruises | -House- keeping program -Spill cleanup supplies -Clear walkways -Warning signs -Non-slip footwear | 5 (Frequent) | 3 (Moderate) | 15 (EXTREME) |
| Hot Work (Welding, Grinding, Soldering) | -Welding -Cutting -Grinding -Open flames -Sparks -Combustibles nearby -Improper PPE | -Fire -Burns -Explosion -Eye injury -Fumes inhalation | -Hot work permit system -Fire watch -Fire extinguisher nearby -Clear area of com- bustibles -Welding screens -PPE (welding helmet, leathers) | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Ladder Safety | -Using damaged ladders -Wrong ladder type for job -Overreaching -Unstable setup -No 3-point contact -Metal ladder near electri- cal sources | -Falls -Fractures -Head injuries -Sprains | -Ladder inspection program -Proper ladder selection -Ladder training -3-point contact maintained -Non- conductive ladders near electrics | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Student/Staff Exposure to Hazards | -Work in occupied areas -No barriers -No warning signs -Work during school hours -Unsecured tools/ materials | -Student injury -Chemical exposure -Noise exposure -Trips/falls | -Barricades -Warning signs -Schedule work during off-hours when possible -Notify staff of work areas -Secure tools/ materials | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
ENERGY SOURCES:
☐ Electrical
☐ Mechanical
☐ Hydraulic
☐ Pneumatic
☐ Chemical
☐ Thermal
☐ Stored energy (springs, capacitors, gravity)
LOTO PROCEDURE STEPS:
1. Notify affected employees
2. Shut down equipment using normal procedure
3. Isolate energy sources (disconnect, valve, etc.)
4. Apply lock and tag
5. Release stored energy
6. Verify isolation - test equipment
7. Perform service/maintenance
8. Remove tools, guards, etc.
9. Notify affected employees
10. Remove lock and tag
11. Restore energy and test
LOTO EQUIPMENT INVENTORY:
☐ Locks (each employee has personal lock)
☐ Tags (durable, attached)
☐ Lock hasps (for multiple locks)
☐ LOTO procedure written for each equipment
ANNUAL LOTO AUDIT:
Date of last audit: ______________ Auditor: ______________
Findings: ______________
LOTO TRAINING:
Authorized employees (perform LOTO): ______________ # trained: ______
Affected employees (work near equipment): ______________ # trained: ______
Other employees: ______________ # trained: ______
HOT WORK PERMIT - REQUIRED FOR: Welding, cutting, grinding, soldering, torch use, any open flame
DATE: ______________ TIME START: ______________ TIME END: ______________
LOCATION: ______________
WORK DESCRIPTION: ______________
PERFORMED BY: ______________ COMPANY: ______________
CHECK BEFORE STARTING WORK:
☐ Area clear of combustibles (35 ft radius)
☐ Floors swept clean, wet down if necessary
☐ Combustible floors/furnishings protected (fire-resistant blankets)
☐ Wall/ceiling openings covered (to prevent spark travel)
☐ Fire extinguisher (ABC) in work area (charged, inspected)
☐ Fire hose available (if required)
☐ Sprinkler system in service (if applicable)
☐ Ventilation adequate (for fumes)
☐ PPE available and worn (welding helmet, gloves, leathers, etc.)
☐ Fire watch assigned and trained
☐ Area posted: "HOT WORK IN PROGRESS"
FIRE WATCH:
Name: ______________ Time: ______________
Responsibilities:
• Remain in area during hot work and for 30 minutes after completion
• Watch for fires/smoke
• Have fire extinguisher ready
• Stop work if unsafe conditions develop
• Know how to sound alarm and call 911
PERMIT ISSUED BY: ______________ SIGNATURE: ______________
POST-WORK CHECK (30 MINUTES AFTER COMPLETION):
☐ No smoldering fires
☐ No hot spots
☐ Area safe
Fire watch signature: ______________ Time: ______________
CONFINED SPACE PERMIT - REQUIRED FOR entry into: tanks, vaults, pits, boilers, manholes, crawlspaces
DATE: ______________ ENTRY TIME: ______________ EXIT TIME: ______________
LOCATION: ______________
PURPOSE OF ENTRY: ______________
ENTRANT(S): ______________
ATTENDANT: ______________
ENTRY SUPERVISOR: ______________
ATMOSPHERIC TESTING (BEFORE ENTRY AND CONTINUOUSLY):
TEST | ACCEPTABLE RANGE | INITIAL TEST | TIME | RETEST | TIME | RETEST | TIME | PASS?
______________ | ______________ | ____________ | ____ | ______ | ____ | ______ | ____ | ______
Oxygen | 19.5% - 23.5% | ____________ | ____ | ______ | ____ | ______ | ____ | ______
Flammable (LEL)| < 10% LEL | ____________ | ____ | ______ | ____ | ______ | ____ | ______
CO | < 35 ppm | ____________ | ____ | ______ | ____ | ______ | ____ | ______
H2S | < 10 ppm | ____________ | ____ | ______ | ____ | ______ | ____ | ______
Other: _______ | ______________ | ____________ | ____ | ______ | ____ | ______ | ____ | ______
EQUIPMENT CHECK:
☐ Ventilation equipment in place and operating
☐ Lighting (explosion-proof if required)
☐ Harness and lifeline for entrant
☐ Tripod/winch for retrieval
☐ Rescue equipment available
☐ Communication equipment (radio, etc.)
☐ PPE (as required)
☐ Lockout/Tagout applied
☐ Barricades/signs in place
ATTENDANT:
• Remain at entry point at all times
• Maintain communication with entrant
• Do not perform other duties
• Monitor for hazardous conditions
• Summon rescue if needed
ENTRY SUPERVISOR AUTHORIZATION:
I verify that all conditions for safe entry have been met.
Signature: ______________ Date: ______________
POST-ENTRY CHECK:
All entrants accounted for? ☐ Yes ☐ No Space secured? ☐ Yes ☐ No
LADDER INSPECTION CHECKLIST - Monthly
LADDER ID #: ______ TYPE: ☐ Step ☐ Extension ☐ Platform ☐ A-frame MATERIAL: ☐ Fiberglass ☐ Aluminum ☐ Wood
INSPECTION ITEMS:
☐ No cracks, splits, or bends
☐ All rungs/steps secure and slip-resistant
☐ No missing or loose hardware (rivets, bolts)
☐ Spreaders/locking mechanisms functional
☐ Ropes/pulleys in good condition (extension ladders)
☐ Locks engage properly
☐ Feet/slip-resistant pads in good condition
☐ No oil/grease on ladder
☐ Labels legible
☐ Not painted (wood ladders)
INSPECTION LOG:
DATE | LADDER ID | INSPECTED BY | CONDITION | DEFICIENCIES | CORRECTIVE ACTION | DATE CORRECTED
________ | _________ | ____________ | _________ | _____________ | ______________ | ______________
________ | _________ | ____________ | _________ | _____________ | ______________ | ______________
________ | _________ | ____________ | _________ | _____________ | ______________ | ______________
LADDER USE TIPS:
☐ Maintain 3-point contact
☐ Do not stand on top 2 rungs (step ladders) or top 4 rungs (extension)
☐ Set up on firm, level surface
☐ Do not overreach - move ladder
☐ Face ladder when climbing
☐ Secure extension ladders (top/bottom)
☐ Set angle: 1:4 ratio (1 ft out for every 4 ft up)
☐ Do not use metal ladders near electrical
PPE HAZARD ASSESSMENT:
Date of last PPE assessment: ______________ Assessor: ______________
TASK-SPECIFIC PPE REQUIREMENTS:
TASK | HEAD | EYE | HEARING | RESPIRATORY | HAND | FOOT | BODY | FALL
______________ | ____ | ___ | _______ | ___________ | ____ | ____ | ____ | ____
Electrical work | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐
(Arc Flash) | (Class E) | | | (Arc rated) | | | |
Carpentry/Construction | ☐ | ☐ | ☐ | ☐ (dust) | ☐ | ☐ | ☐ | ☐ (heights)
Painting | ☐ | ☐ | ☐ | ☐ (organic | ☐ | ☐ | ☐ | ☐ (heights)
| | | | vapor) | | | |
Welding/Cutting | ☐ | ☐ | ☐ | ☐ (fumes) | ☐ | ☐ | ☐ | ☐ (heights)
| (welding hood) | | | (leather) | | (leather) |
Chemical Handling | ☐ | ☐ | ☐ | ☐ (as | ☐ | ☐ | ☐ | ☐
| | (chemical | | needed) | (chemical | (chemical | (chemical |
| | goggles) | | | resistant)| resistant)| resistant)|
Grounds Maintenance | ☐ | ☐ | ☐ | ☐ (dust) | ☐ | ☐ | ☐ | ☐
| (sun protection)| | | | | | (hi-vis) |
Roof Work | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ | ☐ (full arrest)
PPE INSPECTION LOG:
PPE TYPE | LOCATION | LAST INSPECTED | CONDITION | NEEDS REPLACEMENT? | SIGNATURE
___________ | ________ | ______________ | _________ | ______________ | __________
___________ | ________ | ______________ | _________ | ______________ | __________
___________ | ________ | ______________ | _________ | ______________ | __________
RESPIRATOR FIT TESTING:
EMPLOYEE NAME | RESPIRATOR TYPE | FIT TEST DATE | NEXT DUE | MEDICAL EVAL? | SIGNATURE
_____________ | ______________ | _____________ | ________ | _____________ | __________
_____________ | ______________ | _____________ | ________ | _____________ | __________
HAZARD COMMUNICATION PROGRAM:
☐ Written HazCom program
☐ Chemical inventory maintained
☐ SDS accessible to all staff
☐ All containers labeled
☐ Staff trained on chemical hazards
☐ Non-routine task procedures
CHEMICAL STORAGE:
☐ Chemicals stored by compatibility
☐ Flammables in flammable cabinet
☐ Corrosives in corrosive cabinet
☐ No chemicals stored above eye level
☐ Secondary containment for liquids
☐ Shelving secure and grounded (if needed)
☐ Ventilation adequate
☐ Spill kit available and stocked
☐ No food/drink in chemical storage
SPILL RESPONSE:
Spill kit location: ______________
Spill kit contains:
☐ Absorbent materials
☐ Neutralizers (acid/base)
☐ PPE (gloves, goggles, apron)
☐ Disposal bags/containers
☐ Dustpan/broom
☐ Sealing tape
SPILL PROCEDURE:
1. Assess risk - evacuate if necessary
2. Don appropriate PPE
3. Contain spill (absorbents, dikes)
4. Neutralize if appropriate
5. Clean up using proper tools
6. Place waste in labeled container
7. Dispose of waste properly
8. Report spill to supervisor
9. Restock spill kit
SPILL LOG:
DATE | CHEMICAL | QUANTITY | LOCATION | RESPONDER | CLEANUP METHOD | DISPOSAL
________ | ________ | ________ | ________ | _________ | ______________ | ________
________ | ________ | ________ | ________ | _________ | ______________ | ________
EQUIPMENT INVENTORY:
EQUIPMENT TYPE | MODEL | SERIAL # | OWNED/LEASED | LAST INSPECTION | NEXT DUE
______________ | _____ | ________ | ____________ | ______________ | ___________
______________ | _____ | ________ | ____________ | ______________ | ___________
OPERATOR REQUIREMENTS:
☐ Certified/trained operators only
☐ Certification current
☐ Evaluation every 3 years minimum
☐ Pre-use inspection completed
DAILY INSPECTION CHECKLIST:
☐ Tires (condition, pressure)
☐ Forks (no cracks, straight)
☐ Mast/chain (lubricated, no damage)
☐ Safety guards in place
☐ Lights/alarms functioning
☐ Seat belt present/functional
☐ Brakes operational
☐ Steering operational
☐ Hydraulic system (no leaks)
☐ Battery/fuel level
☐ Horn/backup alarm functioning
OPERATING RULES:
• Seat belt always worn
• No passengers
• Load within capacity
• Travel with load low (4-6 inches)
• Sound horn at intersections/blind corners
• No speeding
• Maintain safe distance
• Watch for pedestrians
• Use spotter in tight areas
• No horseplay
• Park with forks down, neutral, brake set
TRAINING RECORDS:
OPERATOR NAME | CERT DATE | EVAL DATE | TRAINER | RECERT DUE
_____________ | _________ | _________ | _______ | ___________
_____________ | _________ | _________ | _______ | ___________
TOOL INSPECTION CHECKLIST:
☐ Tools inspected before each use
☐ Damaged tools removed from service
☐ Electrical cords intact (no fraying, exposed wires)
☐ Plugs intact (no missing prongs)
☐ Guards in place
☐ Safety switches operational
☐ Bits/blades sharp and in good condition
☐ No makeshift repairs
POWER TOOL SAFETY RULES:
• Disconnect when not in use, before servicing, when changing blades
• Keep cords away from heat, oil, sharp edges
• Do not carry by cord
• Use GFCI on all power tools
• Use proper tool for the job
• Wear appropriate PPE
• Secure work with clamps/vise - not hands
• No distractions while using tools
TOOL INVENTORY & INSPECTION LOG:
TOOL | ID # | LAST INSPECTED | CONDITION | DEFICIENCIES | CORRECTIVE ACTION | SIGNATURE
____ | ____ | ______________ | _________ | _____________ | ______________ | __________
____ | ____ | ______________ | _________ | _____________ | ______________ | __________
When maintenance must occur during school hours:
BEFORE WORK BEGINS:
☐ Notify principal/administration
☐ Notify teachers in affected areas
☐ Post warning signs at all access points
☐ Set up barricades/tape to restrict access
☐ Secure tools and materials when not in use
☐ Store chemicals in locked area
DURING WORK:
☐ Maintain barriers throughout work
☐ Never leave hazards unguarded
☐ Keep work area clean - no trip hazards
☐ Control dust (wet methods, vacuums, barriers)
☐ Control noise - schedule loud work when students not present if possible
☐ Do not allow students in work area
☐ Be aware of students nearby
☐ Communicate with staff about any changes
AFTER WORK:
☐ Clean up thoroughly
☐ Remove all barriers/signs when area is safe
☐ Inspect area for hazards before reopening
☐ Notify staff area is safe to use
SPECIAL CONSIDERATIONS:
☐ Asbestos/lead work requires special procedures - cannot be done with students present
☐ Major renovations should be scheduled during breaks
☐ Pest control applications require notification and may require relocation
DEFICIENCY (from inspection or incident) | CORRECTIVE ACTION | RESPONSIBLE | DUE DATE | STATUS
______________ | ______________ | ____________ | ________ | ______
______________ | ______________ | ____________ | ________ | ______
______________ | ______________ | ____________ | ________ | ______
______________ | ______________ | ____________ | ________ | ______
FACILITIES MANAGER SIGNATURE: ______________ DATE: ______________
PRINCIPAL REVIEW:
Signature: ______________ Date: _____________